Dive%20Spread%2015_04%20(95)

Well Safe Guardian SDS Module Installation

In April 2023, a challenging module installation in open water with tight installation tolerances was performed in Firth of Forth, Scotland

The manufacture, transport and fitment of the dive spread was carried out at Burntisland, Rosyth and Methil ports on the east coast of Scotland.
 
A test lift was performed, by HLV Uglen, at Rosyth showing a weight of 480 tons and a accurate calculated center of gravity.
 
The module was then towed to the installation location and sucessfully installed by Uglen.

Well-Safe Solutions debuts saturation dive spread capability on Well-Safe Guardian - Well-Safe Solutions (wellsafesolutions.com)

Other news

27.04.2023 10:55

Well Safe Guardian SDS Module Installation

In April 2023, a challenging module installation in open water with tight installation tolerances was performed in Firth of Forth, Scotland
/ Read more
Well Safe Guardian SDS Module Installation
26.11.2021 13:07

SEMI-SUBMERSIBLE BARGE UR 93 ­ LARGE INFRASTRUCTURE PROJECT IN FINLAND

Ugland Construction AS delivers marine services to Transmares for construction platform, transport by barge, with tug and float-off unloading.
/ Read more
SEMI-SUBMERSIBLE BARGE UR 93 | LARGE INFRASTRUCTURE PROJECT IN FINLAND
19.06.2020 15:44

New container cranes for Belfast Harbour

Ugland Construction AS delivers marine services to TM S.r.l. for transport by barge of two STS cranes in Belfast, Northern Ireland
/ Read more
New container cranes for Belfast Harbour
05.09.2019 11:17

Transportation of ITS structures

Port to port delivery of substructures for Snorre Expantion Project
/ Read more
Transportation of ITS structures
07.08.2019 08:57

HLV Uglen - Njord A Future Project

After the HLV Uglen installed the Njord A derrick more than 20 years ago, we have again installed the derrick of Njord A
/ Read more
HLV Uglen - Njord A Future Project

/ Archive
News