xBilde2

UMPS performs full responsibility shipment of tidal energy substructures from Poland to France

Ugland Marine Project Services UK was responsible for loading and transport of subsea structures for tidal energy from Gdynia to Brest

The project was performed as a full scope service including engineering, fabrication and installation of grillage and seafastening, load out/ in, barge & tug towage from Gdynia, Poland to Brest, France, marine insurance and Project Management.

Our Client, OpenHydro, is a technology buissness that designs and manufactures marine turbines to generate renewable energy from tidal streams.
The electricity produced is completely renewable as it relies on tides that are created by the gravitational effect of the sun and moon.

The structures were delivered to DCNS' yard in Brest for assembly before installation offshore Brest to produce electricity for EDF Energy.

The Project was delivered successfully on schedule, budget and quality.

Other news

27.04.2023 10:55

Well Safe Guardian SDS Module Installation

In April 2023, a challenging module installation in open water with tight installation tolerances was performed in Firth of Forth, Scotland
/ Read more
Well Safe Guardian SDS Module Installation
26.11.2021 13:07

SEMI-SUBMERSIBLE BARGE UR 93 ­ LARGE INFRASTRUCTURE PROJECT IN FINLAND

Ugland Construction AS delivers marine services to Transmares for construction platform, transport by barge, with tug and float-off unloading.
/ Read more
SEMI-SUBMERSIBLE BARGE UR 93 | LARGE INFRASTRUCTURE PROJECT IN FINLAND
19.06.2020 15:44

New container cranes for Belfast Harbour

Ugland Construction AS delivers marine services to TM S.r.l. for transport by barge of two STS cranes in Belfast, Northern Ireland
/ Read more
New container cranes for Belfast Harbour
05.09.2019 11:17

Transportation of ITS structures

Port to port delivery of substructures for Snorre Expantion Project
/ Read more
Transportation of ITS structures
07.08.2019 08:57

HLV Uglen - Njord A Future Project

After the HLV Uglen installed the Njord A derrick more than 20 years ago, we have again installed the derrick of Njord A
/ Read more
HLV Uglen - Njord A Future Project

/ Archive
News